Rehabilitation and Upgrade of Roads in the Port of Durban
R268 million
Client: TNPA
CONTRACT NO. TNPA/2022/11/1352/15874/RFP
Transnet National Ports Authority (TNPA) has identified 21 roads in the Port of Durban for urgent rehabilitation. The degree of rehabilitation varies from surface treatment to reconstruction. The works will take place at three separate locations and thus the Site has been split into three parts:
The full extent of the works that the Contractor is to perform involves, but is not limited to, the following:
a) Establishment of the Contactor’s Site
b) Geotechnical Study, Survey and Design Report
c) Detailed Engineering Design inclusive but not limited to the following:
d) Designs approved/accepted by local road authority (eThekwini Municipality)
e) Contractor’s designer to provide engineering supervision for the heavy rehabilitation of roads and upgrade
f) General
g) Drainage
h) TNPA Rail and Private Sidings
i) Roadworks
j) Ancillary Roadworks
k) Completion / Close-out Report, As-built Drawings and Maintenance Plan
Upgrade of Main Road P233 and D1331
R244 million
Client: KZN DOT
CONTRACT NO. ZNB01071/00000/00/HOD/INF/21/T SOURCING OF A TURNKEY CONTRACTOR (ENGINEER, PROCURE AND CONSTRUCT) FOR THE UPGRADE OF MAIN ROAD P233 FROM KM 0+000 TO KM 11+300 AND DISTRICT ROAD D1331 FROM KM 0+000 TO KM 4+840 IN THE AMAJUBA DISTRICT – SITE CAMP
This project is located in the province of KwaZulu-Natal in the district municipality of DC25 (Amajuba) and local municipality of Newcastle. The P233 and D1331 act as link roads to the P483. The contract is the first EPC (Engineer, Procure, and Construct) project awarded within KwaZulu-Natal.
The scope of works comprises of the following: Initial site assessments, identification of services and site, in addition to preliminary investigations required for the design. This includes the preparation of designs with relevant documentation. Submission of detailed design and drawings for design approval. And the upgrading of P233 from Km 0+000 to Km 11+300 and D1331 from Km 0+000 to Km 4+840 from Gravel to surfacing layer including road prism drainage and ancillary works.